top of page
  • Trustseal_admin

Vehicle ready for the road......

We are sending a new road marking services vehicle out on the road for the first time tonight. Since it arrived as a curtain sider in November our in-house vehicle technicians have:


- Removed the curtain side back, stripping the vehicle down to chassis and cab.

- Welded on a base to the chassis to hold materials, consumables, boilers, generator and gas tank.

- Installed piping to carry the gas around the vehicle as required.

- Installed two boilers, a generator and a gas tank to the rear of the vehicle.

- Installed secure, droppable sides to the vehicle to provide secure storage.

- Installed livery to the cab.

- Installed highway maintenance signs, stickers, beacons and lights.


Welcome to the fleet.




110 views0 comments

Recent Posts

See All
bottom of page